# Shop Floor Scheduler Pro: Finite Capacity Gantt and Tool Life

> Plan every work order of the shop in one go, hour by hour, within each work centre's calendar, never more at once than it runs, never two on one mould. Drag a work order and the rest is recalculated around it; replan from any point after a breakdown. Moulds and dies count their life and block when due.

- **What it is:** Plan every work order of the shop in one go, hour by hour, within each work centre's calendar, never more at once than it runs, never two on one mould. Drag a work order and the rest is recalculated around it; replan from any point after a breakdown. Moulds and dies count their life and block when due.
- **For:** Manufacturing
- **Odoo versions:** 16.0, 17.0, 18.0, 19.0, 20.0 - Community and Enterprise
- **Runs on:** Odoo.sh or Odoo you host yourself - not Odoo Online, which accepts no third-party apps
- **Price:** 249 EUR, one-time, on the Odoo Apps Store
- **Technical name:** bambooforge_mrp_scheduler
- **Not for:** Durations are Odoo's own expected durations; the scheduler does not estimate them.; Just in time plans backward from the order's deadline; it does not level the load across days.; The components check reads Odoo's forecast; what the forecast does not know - a late supplier - the board does not know either.; A crew is a headcount, not a roster of named people and their skills.; One tool per operation; a work order needing several tools is not modelled.; Machine signals are not read; a breakdown is entered by hand (block the work centre, or replan from the stopped work order).
- **Manual:** https://docs.bambooforge.dev/bambooforge_mrp_scheduler/
- **Live demo:** https://demo20.bambooforge.dev/odoo/action-bambooforge_mrp_scheduler.bf_mrp_scheduler_action
- **Store page:** https://apps.odoo.com/apps/modules/20.0/bambooforge_mrp_scheduler
- **Manual last updated:** 2026-10-15

---
# Shop Floor Scheduler Pro: Finite Capacity Gantt and Tool Life

Odoo plans a work order into the first free slot of its work centre and
stops there. When a machine breaks, a rush order lands or a mould wears
out, the plan is what the planner keeps in their head. This app plans the
whole shop, hour by hour, and keeps the plan honest.

## What you get

- **Schedule**: every waiting work order placed in its work centre's working
  calendar, after the operations it waits for, never more at once than the
  work centre runs, never two on one tool; manufacturing orders taken by
  priority, then deadline, then first come first served.
- **A Gantt by the hour**: rows per work centre, the calendar shaded, the
  current moment marked; day, three-day, week and fortnight views.
- **Drag to move**: a work order dragged keeps its duration, snaps to the
  next working time, is **pinned** where it landed, and the rest of its work
  centre is replanned around it.
- **Replan from here**: leave everything planned before a work order alone
  and replan from it on - after a breakdown, from the work order that
  stopped.
- **Tools, moulds and dies** with a life in units: put one on an operation
  and no two work orders hold it at once; every finished work order counts
  its pieces against the life; when it is due the board says so, and when it
  is exhausted no work order starts on it until it is serviced.
- **Components first**: an order's first operation waits for its components
  to arrive; an order nothing is coming for is named.
- **Changeovers**: setting a mould up is planned in front of the work order
  that needs it, and orders due the same day that use the same mould run one
  after another.
- **Just in time**: backward from the deadline - the last operation ending
  at it - forward again when there is no room.
- **Maintenance blocks**: time booked off a machine, drawn on the board and
  planned around.
- **Operator crews**: machines that share people never run more work orders
  at once than there are people on shift.
- **Conflicts named**: overlaps beyond capacity, a tool double-booked, a tool
  past its life, components that will not be there, a crew over its
  headcount, a work order ending after its order's deadline.

![The shop floor board: work centres by the hour, a pinned order, a mould due](board.png)

## Requirements

- **Odoo**: 20.0, Community or Enterprise, with **Manufacturing** installed.
- Work centres with a **working calendar** (every work centre has one).
- **Access**: Manufacturing users see the board and the tools; Manufacturing
  administrators manage tools.

## Install

1. Copy `bambooforge_mrp_scheduler` into your addons path and restart Odoo.
2. *Apps ▸ Update Apps List*, search for *Shop Floor Scheduler*, **Activate**.
3. *Manufacturing ▸ Planning ▸ Shop Floor Schedule*.

## Setting up

**Work centres.** *Manufacturing ▸ Configuration ▸ Work Centers*: each one
has a working calendar; set **Work Orders at Once** to how many it really
runs side by side (a bench with three people: 3; a press: 1).

**Crews.** *Manufacturing ▸ Configuration ▸ Operator Crews*: a crew and how
many people are on shift. On each work centre that draws on it, pick the
**Crew** and the **Operators per Work Order**. Three presses and two
operators: the scheduler never runs a third press at the same time.

**Tools and moulds.** *Manufacturing ▸ Configuration ▸ Tools and Moulds*:
a name, the work centres it fits, its **life in units** (0 for no limit),
at how many units left to **warn**, and its **changeover** in minutes - the
time to set it up on a machine that last ran with another tool. Then open the operation in the bill
of materials and pick the tool under **Tool / Mould**: every work order of
that operation holds it.

![A mould near the end of its life](tool.png)

## Planning

**Schedule** plans every waiting work order of the work centres on the board
(or of all of them). A running work order and a pinned one are left where
they are and planned around. Three choices sit next to the button:

- **As soon as possible** or **Just in time for the deadline**. Just in time
  plans each order backward: its last operation ends at the order's
  deadline, each operation before it ends where the next begins. An order
  that would then have to start in the past - or before its components
  arrive - is planned as soon as possible instead, and shows late if it is.
  An order without a deadline is always planned as soon as possible.
- **Components**: the first operation of an order does not start before its
  components are expected - the forecast Odoo keeps from receipts and other
  orders. An order short of a component nothing is coming for is planned all
  the same, and named in the result and among the conflicts.
- **Group by tool**: among orders of the same priority due the same day,
  those whose first operation uses the same tool are planned one after
  another. A tool's changeover is planned only when the machine last ran with
  another tool (or when nothing is known of what ran on it); it is drawn as a
  hatched stretch in front of the bar, and the work order starts once it is
  over. Work runs over the lunch break and never outside the calendar; a
  work order longer than the day continues the next morning. The button
  says how many were planned and names any that could not be placed within
  ninety days.

**Drag** a bar left or right: it keeps its duration, lands at the next
working time (a Saturday drop lands Monday morning), is pinned, and the rest
of that work centre is replanned from that moment. **Unpin** hands it back
to the scheduler.

**Replan from here** (on the selected work order) leaves everything planned
before it untouched and replans from it on - the honest way to absorb a
breakdown or a rush order without shuffling the morning.

**Schedule Work Centres** on a manufacturing order does the same for the
work centres that order uses and opens the board.

**Block time** (beside the board): a work centre, a start, an end and a
reason - a service, a trial run. The block is drawn on the row, hatched, and
the next Schedule plans around it; the cross on it removes it. Blocks are
Odoo's own time off on the work centre's resource, so a block entered from
Odoo's resource screens counts the same.

The board shows a work order's manufacturing order, product, quantity,
state, duration, tool, planned span and, when it ends after the order's
deadline, that it is late. Click a bar for the details; **Open** goes to the
work order.

## Conflicts

Listed beside the board, each pointing at its work order:

- **capacity** - more work orders overlap on a work centre than it runs at
  once (a hand-placed order, or a work order planned by something else);
- **tool** - two work orders hold the same tool at the same time;
- **tool life** - the tool on a work order is due or exhausted;
- **material** - an order's first operation starts before its components are
  expected, or nothing is coming for one of them;
- **crew** - more operators needed at one moment than the crew has;
- **late** is on the bar itself, red.

Schedule clears the first two; the third needs the tool serviced.

## Tool life

When a work order is finished, its produced quantity is added to the tool's
**units since service** and written in the tool's usage log. Below the warn
threshold the tool is **due**; at zero life left it is **exhausted** and
*Start* on any work order that holds it is refused with the units left and
the units needed. **Serviced** on the tool resets the counter and dates the
service.

## Limits, stated plainly

- Durations are Odoo's own expected durations; the scheduler does not
  estimate them.
- Just in time plans backward from the order's deadline; it does not level
  the load across days.
- The components check reads Odoo's forecast; what the forecast does not
  know - a late supplier - the board does not know either.
- A crew is a headcount, not a roster of named people and their skills.
- One tool per operation; a work order needing several tools is not
  modelled.
- Machine signals are not read; a breakdown is entered by hand (block the
  work centre, or replan from the stopped work order).

## Uninstalling

Uninstalling removes the tools, their logs and the pin flags. Work orders
keep the dates they had.

## Changelog

### 20.0.1.1.0

- Built for Odoo 20: record rules and access rights rewritten onto Odoo 20's single ir.access model, the screens rebuilt on Owl 3, and every icon moved to the icon set Odoo 20 ships.

### 20.0.1.1.0

- Components: the first operation waits for them; missing supply named.
- Tool changeover planned in front of the work order; same-tool orders
  grouped.
- Just in time: backward scheduling from the deadline.
- Maintenance blocks on the board; operator crews shared by work centres.
- An order's start copied back by Odoo from its own work orders no longer
  holds it where the last run left it.

### 20.0.1.0.0

First release.

## How we make sure it works

Before every release, **16 automated checks** run against this app on Odoo 16, 17, 18, 19 and 20.
Among them:

- A tool is never held twice.
- Nothing coming is said.
- Work runs over the break and never at night.
- A block on a machine without a calendar.
- A centre counts what runs at once.

The complete list is in the source you receive.