# Construction Job Costing & Cost Control

> Construction job costing: budget by phase and cost type, commitments from purchase orders, actuals from bills and timesheets, cost to complete.

- **What it is:** Construction job costing: budget by phase and cost type, commitments from purchase orders, actuals from bills and timesheets, cost to complete.
- **For:** Project
- **Odoo versions:** 16.0, 17.0, 18.0, 19.0, 20.0 - Community and Enterprise
- **Runs on:** Odoo.sh or Odoo you host yourself - not Odoo Online, which accepts no third-party apps
- **Price:** 179 EUR, one-time, on the Odoo Apps Store
- **Technical name:** bambooforge_job_costing
- **Not for:** Said before you buy, because it is the half that decides whether the app fits:; Post accounting entries of its own: it reads posted bills, timesheets and confirmed purchase orders.; Report a cost to complete below what is already committed.
- **Manual:** https://docs.bambooforge.dev/bambooforge_job_costing/
- **Live demo:** https://demo20.bambooforge.dev/odoo/action-bambooforge_job_costing.action_bf_job
- **Store page:** https://apps.odoo.com/apps/modules/20.0/bambooforge_job_costing
- **Manual last updated:** 2026-10-15

---
# Construction Job Costing & Cost Control

A contractor's question is never *what did we spend* — it is *will this job
still make money*. That takes four numbers per phase, and this app keeps all
four current from the documents you already raise.

## The four numbers

**Budget** — what the estimate said, by phase and cost type, plus whatever
approved change orders have moved.

**Committed** — purchase orders confirmed and not yet billed. The money is
spoken for even though no bill has arrived.

**Actual** — posted vendor bills, timesheet hours at the employee's cost, and
anything you enter by hand.

**Cost to complete** — budget minus actual by default, never less than what
is already committed; or your own figure when the site says the remaining
work costs more than the paper does.

From those come **cost at completion**, **variance**, **percent complete**
and a **projected margin** that moves the day a change order is signed.

## Install

1. Install **BambooForge Construction Job Costing** (depends on Accounting,
   Purchase and Project).
2. Give the estimator and the PM **Job Costing: Manager**; site staff can get
   **Job Costing: User**, which reads everything and can add cost entries.
3. The **Job Costing** menu appears with Jobs, Cost to Complete, Cost
   Entries, Change Orders and Phases.

## Set a job up

*Job Costing → Jobs → New*

1. **Job number** and **name** — the number is unique per company and is what
   everybody will type.
2. **Customer** and **original contract** — what was signed.
3. **Phases** — the way you cut the job up, with your own cost codes
   (03300 Slab, 07500 Roofing…).
4. **Budget** — one line per phase and cost type (labour, material,
   subcontract, equipment, other) with the estimate in *Original budget*.

Press **Start job**. A job cannot start without a budget: there would be
nothing to measure against.

## Let the documents do the work

**Purchase orders.** Every order line has *Job*, *Phase* and *Cost type*.
Confirm the order and the line becomes a **commitment** on that budget line.
Cancel it and the commitment goes.

**Vendor bills.** Post a bill and it becomes an **actual**. A bill made from
a purchase order inherits the order line's job, phase and cost type — leave
those fields empty on the bill and the commitment is released by exactly the
amount billed. Reset the bill to draft and both move back.

**Credit notes** reduce the actual.

**Timesheets.** Link the job to a project, and every hour booked on that
project carries *Job*, *Phase* and *Cost type* on the timesheet line. The cost
is the employee's hourly cost times the hours, so own crews sit next to
subcontractors in the same report. Correct the hours and the cost follows;
delete the line and it goes. An hour with no phase is not costed — there is no
budget line to put it on — and an employee with no hourly cost set is booked at
zero rather than guessed.

**Anything else** — plant you own, a cost you are still arguing about — can be
entered by hand under *Cost Entries*, and cancelled without deleting the
history.

A budget line is created automatically when a purchase or a bill lands on a
phase and cost type you had not budgeted. It shows with a zero budget and the
full amount as variance, which is exactly what an unbudgeted commitment is.

## Change orders

*Job Costing → Change Orders*

A change order carries two things: the **contract change** (what the customer
agreed to pay) and the **budget lines** it moves (what it will cost, by phase
and cost type). The difference is the change order's own margin, shown on the
form before anybody signs.

Nothing moves while the change order is draft or submitted. **Approve** it and
the contract value and the budgets both move — and an approved change order
cannot be reopened: raise a reversing one instead, so the baseline stays
honest.

## Reading the job

The job form shows the totals; the **Budget** tab is the classic cost-to-
complete report, red where the variance has gone negative.

*Cost to Complete* opens the same lines across every job, with a pivot of
phase against cost type. It is the report to bring to a Monday meeting.

Every number drills down: the magnifier on a budget line opens the entries
behind it, and each entry opens the purchase order or bill it came from.

## What it does not do

Said before you buy, because it is the half that decides whether the app fits:

- Post accounting entries of its own: it reads posted bills, timesheets and confirmed purchase orders.
- Report a cost to complete below what is already committed.

## Troubleshooting

****A confirmed order shows no commitment****

Its line has no job or no phase. Fill them in and confirm again, or add a
manual entry.

****The commitment did not go down when I billed****

The bill line must be linked to the purchase line (bill from the order,
or set *Purchase Order Line*). A bill typed from scratch is an actual on
its own and cannot know which commitment it replaces.

****Cost to complete looks too high****

It never falls below what is committed: if you have ordered more than the
budget, the forecast says so. Use *Revised cost to complete* to state
what you actually expect.

****A timesheet hour did not reach the job****

The hour must be on a project that a job points at, and the line needs a
phase. Check *Job Costing → Jobs → the job → Project*, then the *Job* and
*Phase* columns on the timesheet line.

****Percent complete does not match the site****

It is cost-based (actual ÷ cost at completion). A job that has bought all
its material on day one reads high; that is the nature of a cost-based
measure, not an error.

****An approved change order was wrong****

Raise a second change order with the opposite amounts. The history of
what was approved, and when, is worth more than a tidy list.

## What changed in 1.1

- **Progress billing (AIA G702/703 style).** Applications for payment with
  a schedule of values per phase (defaulted pro-rata from the budget),
  cumulative percent complete, previous billed, current due - and one
  click turns the application into the customer invoice.
- **Retainage.** A percentage withheld on every application, tracked on
  the job, released with its own application when the contract says so.
- **Earned value, the light version.** EV and CPI from the numbers the job
  already keeps; PV and SPI from a straight-line plan between start and
  planned completion - labelled as such, no false precision.

## What changed in 1.2

- **WIP schedule.** *Job Costing -> WIP Schedule*: earned revenue against
  billings per job (percentage-of-completion), with over/under-billing
  columns and totals - the sheet the accountant builds by hand at every
  close.
- **CSI starter phases.** One button seeds a job with the MasterFormat
  divisions; codes you already use are left untouched.

## How we make sure it works

Before every release, **55 automated checks** run against this app on Odoo 16, 17, 18, 19 and 20.
Among them:

- A job cannot start without a budget.
- Read only role cannot bill.
- An hour without a phase is not costed.
- An approved change order cannot be edited.
- An approved change order cannot be reopened.

The complete list is in the source you receive.